This feature makes it possible for organizations that use the scheduling type Schedule operations to check for material availability. Previously, it was only possible to check for material availability when using the Schedule jobs scheduling type.Before releasing a production order to the shop floor, production supervisors can check the material availability of each order by going to the Production floor management workspace and selecting the Production orders to release tile. The Production orders to release page now lists and indicates material availability both for orders that use the Schedule operations scheduling type and for orders that use the Schedule jobs scheduling type.